Maintenance schedule

What keeps BactoBox® working well, and how often.

Keep the software up to date

What to do
When to do it

After every measurement, unless the next vial is a less dilute vial of the same sample

Every day bulk dilution liquid is in use

Deep clean (15 minutes), then QC test

Every week BactoBox® is in use, before the first measurement. The QC test page lists the other cases that need one.

Every week: deep clean, then QC test

Start each week BactoBox® is in use with a deep clean and a QC test, before the first measurement. Skip both in weeks BactoBox® is not used.

Deep clean with a deep clean vial for 15 minutes. Then the QC test: clean with a disinfection vial, measure the QC vial, clean with the same disinfection vial, and measure a dilution vial as the blank. Two check marks mean BactoBox is ready for samples.
  1. Deep clean for 15 minutes.

  2. QC test. The QC test starts by cleaning with a disinfection vial.

After a period without use, or when BactoBox® is back from service, start with these two steps.

At the end of the day

Run a Clean, power off BactoBox®, and leave the tubing kit in the disinfection vial. Discard that vial the next morning and start the day with a fresh one. For longer periods without use, see Shipping and storage.

Working with a dilution dispenser

With a dilution dispenser, replace the 0.22 µm syringe filter mounted on it at the start of each day. Replace it sooner if it squeaks or needs more force to dispense. Then test the dilution liquid.

Replacing the 0.22 µm syringe filter on a dilution dispenser

See Replace the syringe filter for the full procedure.