Qualification

Qualification happens in two phases:

In phase A, BactoBox® both tunes and qualifies. This happens simultaneously.

In phase B, we qualify further.

The setup passes qualification if it passes both phase A and phase B. When we say setup we mean the combination of all items: BactoBox®, flow cell, tubing kit, external filter, etc.

Always qualify on setup change

Get things ready

1

Prepare 2 × dilution vials

Find two dilution vials and place them the vial rack next to the tubing kit. We'll use these dilution vials shortly (one for each phase).

Use SBT's dilution vial for the best results

Only use non-SBT dilution liquid if you absolutely must

Avoid non-SBT vials

2

That is it!

Next, we make a QC vial. See Make QC vial.

Last updated

Was this helpful?